Eric: Great, thorough article.

You outline a lot of deployment risks that share many elements with hardware development risk (which is a subset of the larger risk portfolio you address). The reliability engineering field has many tools to identify and manage risk (failure mode identification, FMEA, mitigation, testing, etc.) which are agnostic to the system or process being analyzed. E.g., they would apply well to a lower-level hardware component or subsystem, a complex cross-functional system, a larger plant or operation, or to the business endeavor or sector as a whole.

I'd be interested to hear your experiences on how and where you have seen these tools and methodologies used in the deployment of energy hardware projects.

Silas Mähner's avatar

damn, this is a crazy good resource.